1 00:00:21,349 --> 00:00:18,400 [Music] 2 00:00:23,689 --> 00:00:21,359 Saturn five quarterly film report number 3 00:00:29,570 --> 00:00:23,699 ten covers progress during the period 4 00:00:32,120 --> 00:00:29,580 March April May 1965 development 5 00:00:34,490 --> 00:00:32,130 manufacturing and testing of s1c stage 6 00:00:36,350 --> 00:00:34,500 components by the Boeing Company and the 7 00:00:41,270 --> 00:00:36,360 Marshall Center continued throughout the 8 00:00:44,569 --> 00:00:41,280 quarter following installation of the s1 9 00:00:47,170 --> 00:00:44,579 CT static firing stage on March 1st in 10 00:00:49,490 --> 00:00:47,180 Marshalls new s1c static test and 11 00:00:51,470 --> 00:00:49,500 structural load testing of the vehicle's 12 00:00:55,639 --> 00:00:51,480 thrust structure was successfully 13 00:00:59,150 --> 00:00:55,649 performed propellant load testing of the 14 00:01:03,049 --> 00:00:59,160 s1 CT was then conducted in preparation 15 00:01:05,600 --> 00:01:03,059 for its initial firing installation of 16 00:01:08,090 --> 00:01:05,610 the stages 5 F 1 engines completed on 17 00:01:18,950 --> 00:01:08,100 March 30th was accomplished in three 18 00:01:21,499 --> 00:01:18,960 days on April 10th approximately two 19 00:01:24,200 --> 00:01:21,509 months ahead of schedule a 16 second 20 00:01:26,480 --> 00:01:24,210 static test of the s1 CT center engine 21 00:01:28,850 --> 00:01:26,490 was successfully conducted with no major 22 00:01:30,499 --> 00:01:28,860 problems encountered two attempts on the 23 00:01:34,969 --> 00:01:30,509 previous day had failed to meet test 24 00:01:36,620 --> 00:01:34,979 requirements after an analysis of 25 00:01:39,289 --> 00:01:36,630 performance data from the single engine 26 00:01:51,240 --> 00:01:39,299 firing a decision was made to test all 27 00:01:57,640 --> 00:01:55,360 on April 16th a Saturn 5 program major 28 00:02:00,460 --> 00:01:57,650 milestone was attained with a fully 29 00:02:03,100 --> 00:02:00,470 successful 5 engine static firing for a 30 00:02:04,570 --> 00:02:03,110 duration of 6 and a half seconds total 31 00:02:09,550 --> 00:02:04,580 thrust of seven and a half million 32 00:02:11,260 --> 00:02:09,560 pounds was developed over 1,000 33 00:02:13,150 --> 00:02:11,270 measurements of the s-1 cetys 34 00:02:15,850 --> 00:02:13,160 performance were made and recorded in 35 00:02:29,800 --> 00:02:15,860 the blockhouse located some 800 feet 36 00:02:32,740 --> 00:02:29,810 from the test stand a second successful 37 00:02:36,430 --> 00:02:32,750 5 engine firing was held on May 6th this 38 00:02:38,259 --> 00:02:36,440 time for 15 seconds on May 20th a 40 39 00:02:40,300 --> 00:02:38,269 second test was conducted during which 40 00:02:42,790 --> 00:02:40,310 the 4 outboard engines were gimballed 41 00:02:45,130 --> 00:02:42,800 early next quarter a one and a half 42 00:02:46,840 --> 00:02:45,140 minute test is scheduled and then a two 43 00:02:52,449 --> 00:02:46,850 and a half minute or full duration 44 00:02:54,310 --> 00:02:52,459 static firing in Marshalls log test our 45 00:02:56,410 --> 00:02:54,320 testing of the fuel tank thrust 46 00:02:59,080 --> 00:02:56,420 structure assembly for the s1 CS 47 00:03:01,569 --> 00:02:59,090 structural test stage was begun this 48 00:03:04,000 --> 00:03:01,579 quarter the tests performed to date have 49 00:03:08,890 --> 00:03:04,010 been successful testing will continue 50 00:03:11,380 --> 00:03:08,900 for the next several months the s-1 CS 51 00:03:13,840 --> 00:03:11,390 LOX tank was completed March 11th and 52 00:03:18,729 --> 00:03:13,850 placed in storage for future structural 53 00:03:20,890 --> 00:03:18,739 testing Assembly of s1 c1 the first 54 00:03:23,289 --> 00:03:20,900 flight stage moved steadily toward 55 00:03:25,240 --> 00:03:23,299 completion after the fuel tank and 56 00:03:27,190 --> 00:03:25,250 thrust structure were mated in the VAB 57 00:03:29,650 --> 00:03:27,200 the unit was transferred to the 58 00:03:31,720 --> 00:03:29,660 horizontal assembly area following 59 00:03:34,289 --> 00:03:31,730 completion of the inter tank locks tank 60 00:03:36,670 --> 00:03:34,299 forward skirt assembly slated for June 61 00:03:41,440 --> 00:03:36,680 horizontal mating of the two units will 62 00:03:44,229 --> 00:03:41,450 be accomplished fabrication and assembly 63 00:03:46,390 --> 00:03:44,239 of s1 sea to the second flight stage 64 00:03:48,940 --> 00:03:46,400 included completion and mating of the 65 00:03:53,650 --> 00:03:48,950 fuel tank halves plus completion of LOX 66 00:03:55,900 --> 00:03:53,660 tank bulkheads at Marshall's Mishu 67 00:03:57,850 --> 00:03:55,910 operations in New Orleans the Boeing 68 00:04:01,360 --> 00:03:57,860 Company continued with its assembly of 69 00:04:02,960 --> 00:04:01,370 the dynamic test stage s1 CD the first s 70 00:04:06,440 --> 00:04:02,970 1c stage to be my 71 00:04:08,810 --> 00:04:06,450 there in March the s1c be thrust 72 00:04:12,970 --> 00:04:08,820 structure was installed in misuse newly 73 00:04:17,720 --> 00:04:15,170 following completion of fuel tank 74 00:04:20,330 --> 00:04:17,730 hydrostatic testing vertical assembly of 75 00:04:22,280 --> 00:04:20,340 the s1 CD continued with stacking of the 76 00:04:27,200 --> 00:04:22,290 fuel tank and the inner tank on the 77 00:04:29,330 --> 00:04:27,210 thrust structure the for helium bottles 78 00:04:34,550 --> 00:04:29,340 for pressurizing the fuel tank were 79 00:04:36,980 --> 00:04:34,560 installed in the LOX tank in April the 80 00:04:39,380 --> 00:04:36,990 LOX tank was assembled on April 18th in 81 00:04:44,630 --> 00:04:39,390 the Bab with mating of the lower and 82 00:04:47,510 --> 00:04:44,640 upper halves during the quarter boeing 83 00:04:50,060 --> 00:04:47,520 continued work on s1 CF facilities 84 00:04:53,120 --> 00:04:50,070 checkout stage and began assembly of s1 85 00:04:59,150 --> 00:04:53,130 c2 the first flight stage to be built at 86 00:05:01,520 --> 00:04:59,160 Mishu with initial bulkhead welding atma 87 00:05:03,050 --> 00:05:01,530 shoes new stage test facility computer 88 00:05:05,360 --> 00:05:03,060 and telemetry equipment have been 89 00:05:07,070 --> 00:05:05,370 installed in the support section the 90 00:05:09,680 --> 00:05:07,080 equipment will be used to obtain and 91 00:05:12,409 --> 00:05:09,690 evaluate information from the various s1 92 00:05:22,550 --> 00:05:12,419 c systems being tested under simulated 93 00:05:25,400 --> 00:05:22,560 flight conditions the first s2 stage 94 00:05:27,860 --> 00:05:25,410 five engine cluster ignition test was 95 00:05:31,159 --> 00:05:27,870 successfully conducted on April 24th at 96 00:05:33,469 --> 00:05:31,169 Santa Susana field laboratory the five 97 00:05:35,960 --> 00:05:33,479 second Test consisted of Battleship LH 98 00:05:37,870 --> 00:05:35,970 to tank preconditioning loading of 99 00:05:39,980 --> 00:05:37,880 propellants to prescribed levels 100 00:05:42,469 --> 00:05:39,990 preconditioning of engines and related 101 00:05:44,420 --> 00:05:42,479 systems and performing the engine start 102 00:05:47,390 --> 00:05:44,430 sequence through the ignition phase a 103 00:05:49,730 --> 00:05:47,400 prime test objective was verification of 104 00:05:52,670 --> 00:05:49,740 the proper sequence of j2 engine cluster 105 00:05:56,870 --> 00:05:52,680 operation all test objectives were 106 00:05:58,880 --> 00:05:56,880 successfully achieved on may 1st a 10 107 00:06:00,830 --> 00:05:58,890 second cluster main stage test was 108 00:06:02,860 --> 00:06:00,840 attempted but was terminated prematurely 109 00:06:04,960 --> 00:06:02,870 after one second 110 00:06:06,520 --> 00:06:04,970 an ignition detected signal was not 111 00:06:17,770 --> 00:06:06,530 received from the number three engine 112 00:06:20,170 --> 00:06:17,780 and cut off occurred automatically on 113 00:06:22,420 --> 00:06:20,180 May 7th at Santa Susana are completely 114 00:06:24,520 --> 00:06:22,430 successful 10 second cluster firing of 115 00:06:26,680 --> 00:06:24,530 the 5j two engines of the battleship 116 00:06:29,560 --> 00:06:26,690 stage marked the attainment of a major 117 00:06:32,380 --> 00:06:29,570 program milestone by the s2 prime 118 00:06:35,140 --> 00:06:32,390 contractor North American Aviation space 119 00:06:37,300 --> 00:06:35,150 and information systems division test 120 00:06:39,790 --> 00:06:37,310 objectives included preconditioning of 121 00:06:45,100 --> 00:06:39,800 the battleship LH to tank the engines 122 00:06:47,860 --> 00:06:45,110 and related systems structural testing 123 00:06:50,890 --> 00:06:47,870 of the s2 SD structural test dynamic 124 00:06:53,200 --> 00:06:50,900 test stage got underway on March 22nd 125 00:06:55,570 --> 00:06:53,210 with engine thrust load tests on the 126 00:06:58,060 --> 00:06:55,580 thrust structure upon completion of this 127 00:07:03,760 --> 00:06:58,070 series of tests body load tests will be 128 00:07:06,910 --> 00:07:03,770 conducted at SN IDS seal Beach facility 129 00:07:09,070 --> 00:07:06,920 the s2 common bulkhead test tank was 130 00:07:11,140 --> 00:07:09,080 successfully Hydra status today March 131 00:07:13,270 --> 00:07:11,150 and returned to the vertical Assembly 132 00:07:16,990 --> 00:07:13,280 Building where assembly was completed on 133 00:07:19,330 --> 00:07:17,000 May 26th the CB TT was then shipped to 134 00:07:25,090 --> 00:07:19,340 SATA Sena where the test program is 135 00:07:27,160 --> 00:07:25,100 scheduled to begin next quarter a major 136 00:07:29,110 --> 00:07:27,170 milestone was reached with completion of 137 00:07:30,850 --> 00:07:29,120 structural build-up of the all system 138 00:07:33,300 --> 00:07:30,860 stage at the seal Beach vertical 139 00:07:35,560 --> 00:07:33,310 Assembly Building on May 26th 140 00:07:38,110 --> 00:07:35,570 high-pressure pneumatic testing of the 141 00:07:40,330 --> 00:07:38,120 LH 2 and lox tanks was completed next 142 00:07:46,240 --> 00:07:40,340 day and the stage was transferred to 143 00:07:48,550 --> 00:07:46,250 station 2 for systems installation the 144 00:07:50,620 --> 00:07:48,560 s2f thrust structure this quarter became 145 00:07:52,800 --> 00:07:50,630 the first completed major sub assembly 146 00:07:55,450 --> 00:07:52,810 for the facilities check out stage 147 00:08:00,160 --> 00:07:55,460 structural assembly was begun on April 148 00:08:03,490 --> 00:08:00,170 5th fabrication and assembly of the 149 00:08:05,650 --> 00:08:03,500 first s to flight stage s21 continued 150 00:08:08,500 --> 00:08:05,660 this quarter with the initial insulation 151 00:08:12,970 --> 00:08:08,510 bonding operation on LH to tank cylinder 152 00:08:15,670 --> 00:08:12,980 number for fabrication of the common 153 00:08:16,450 --> 00:08:15,680 bulkhead and assembly of the quarter 154 00:08:21,010 --> 00:08:16,460 panels for the 155 00:08:23,110 --> 00:08:21,020 thrush structure in Essen ID's 156 00:08:25,900 --> 00:08:23,120 electromechanical mock-up control room 157 00:08:27,279 --> 00:08:25,910 at Donnie s two-stage automatic checkout 158 00:08:30,430 --> 00:08:27,289 equipment installation is now complete 159 00:08:33,399 --> 00:08:30,440 and stage and GSA integration is being 160 00:08:35,769 --> 00:08:33,409 accomplished gse and stage integration 161 00:08:41,019 --> 00:08:35,779 in the local control mode was completed 162 00:08:42,820 --> 00:08:41,029 on April 29th development testing of the 163 00:08:45,280 --> 00:08:42,830 eight solid propellant illage rocket 164 00:08:47,769 --> 00:08:45,290 motors which will be mounted on the s2 165 00:08:49,930 --> 00:08:47,779 inter stage structure is underway at 166 00:08:53,019 --> 00:08:49,940 rocket dines McGregor Texas facility 167 00:08:55,090 --> 00:08:53,029 during Saturn five flights these motors 168 00:08:58,150 --> 00:08:55,100 will be fired simultaneously at the 169 00:09:08,350 --> 00:08:58,160 instant the s1c stages engines are shut 170 00:09:10,389 --> 00:09:08,360 down the s4b facilities checkout stage 171 00:09:12,790 --> 00:09:10,399 which was installed in beta test and 172 00:09:14,949 --> 00:09:12,800 number three at Douglas Aircraft Company 173 00:09:17,380 --> 00:09:14,959 Sacramento test facility late last 174 00:09:19,510 --> 00:09:17,390 quarter underwent successful propellant 175 00:09:21,970 --> 00:09:19,520 loading tests in both manual and 176 00:09:24,160 --> 00:09:21,980 semi-automatic modes during this report 177 00:09:26,230 --> 00:09:24,170 period it was the first loading of 178 00:09:28,960 --> 00:09:26,240 cryogenic propellants into a flight type 179 00:09:31,600 --> 00:09:28,970 s4b with more than a hundred tons of 180 00:09:35,050 --> 00:09:31,610 liquid hydrogen at minus 423 degrees 181 00:09:37,410 --> 00:09:35,060 Fahrenheit and liquid oxygen at 297 182 00:09:39,880 --> 00:09:37,420 degrees being pumped into the stage 183 00:09:42,220 --> 00:09:39,890 workability of tests and equipment and 184 00:09:55,249 --> 00:09:42,230 compatibility of stage and stand were 185 00:10:01,139 --> 00:09:58,649 also at Sacto the s4b battleship test 186 00:10:03,839 --> 00:10:01,149 program continued this quarter in beta 187 00:10:06,449 --> 00:10:03,849 test and number one with a completion of 188 00:10:08,819 --> 00:10:06,459 Saturn 1b development firings in mid-may 189 00:10:11,579 --> 00:10:08,829 the battleship stage is being equipped 190 00:10:14,339 --> 00:10:11,589 with a Saturn 5 configuration j2 engine 191 00:10:18,869 --> 00:10:14,349 and Saturn 5 testing will begin next 192 00:10:20,519 --> 00:10:18,879 quarter construction of the vertical 193 00:10:22,379 --> 00:10:20,529 checkout lab progressed during the 194 00:10:25,919 --> 00:10:22,389 report period with erection of 195 00:10:27,839 --> 00:10:25,929 structural steel being accomplished at 196 00:10:29,999 --> 00:10:27,849 Douglass's huntington beach plant 197 00:10:33,719 --> 00:10:30,009 joining of the liquid oxygen and liquid 198 00:10:36,119 --> 00:10:33,729 hydrogen tanks for the s4 be 501 the 199 00:10:37,529 --> 00:10:36,129 first Saturn 5 flight stage was 200 00:10:42,239 --> 00:10:37,539 completed and the stage was 201 00:10:43,889 --> 00:10:42,249 hydrostatically tested the stage was 202 00:10:45,389 --> 00:10:43,899 then moved into the cleaning tower for 203 00:10:46,949 --> 00:10:45,399 cleaning operations prior to 204 00:10:50,969 --> 00:10:46,959 installation of propellant tank 205 00:10:54,779 --> 00:10:50,979 insulation fabrication and assembly of 206 00:10:58,969 --> 00:10:54,789 components for s4b 502 the second Saturn 207 00:11:00,779 --> 00:10:58,979 5 flight stage moved steadily ahead 208 00:11:02,759 --> 00:11:00,789 qualification testing of stage 209 00:11:07,559 --> 00:11:02,769 components such as this umbilical 210 00:11:09,599 --> 00:11:07,569 disconnect continued at santa monica at 211 00:11:12,029 --> 00:11:09,609 air researches test facility in phoenix 212 00:11:14,129 --> 00:11:12,039 arizona qualification testing of the 213 00:11:19,139 --> 00:11:14,139 fuel feed duct was conducted by the 214 00:11:20,969 --> 00:11:19,149 douglas subcontractor structural testing 215 00:11:23,489 --> 00:11:20,979 such as this LOX tank water pressure 216 00:11:27,199 --> 00:11:23,499 test was also underway at Douglass's 217 00:11:29,729 --> 00:11:27,209 space system center at huntington beach 218 00:11:31,379 --> 00:11:29,739 at the marshall center the first j2 219 00:11:33,659 --> 00:11:31,389 engine to be delivered there by 220 00:11:36,269 --> 00:11:33,669 Rocketdyne was installed in the newly 221 00:11:39,119 --> 00:11:36,279 completed s4 be battleship test and in 222 00:11:41,699 --> 00:11:39,129 April initial static firings will be for 223 00:11:53,730 --> 00:11:41,709 the Saturn 1b program the stand will be 224 00:12:00,460 --> 00:11:57,790 as part of its f1 engine casting quality 225 00:12:02,680 --> 00:12:00,470 control program Rocketdyne is now 226 00:12:04,780 --> 00:12:02,690 employing the high-energy x-ray service 227 00:12:08,110 --> 00:12:04,790 of the Southern California Cancer Center 228 00:12:09,880 --> 00:12:08,120 the 2 million volt x-ray machine used 229 00:12:12,070 --> 00:12:09,890 for cancer diagnosis and treatment 230 00:12:14,470 --> 00:12:12,080 during the day is utilized in the 231 00:12:17,590 --> 00:12:14,480 evening for radiography of f1 engine 232 00:12:19,360 --> 00:12:17,600 cast components high-energy x-ray 233 00:12:21,820 --> 00:12:19,370 inspection has several advantages over 234 00:12:24,310 --> 00:12:21,830 conventional methods including deep 235 00:12:26,620 --> 00:12:24,320 penetration of up to 12 inches of steel 236 00:12:29,710 --> 00:12:26,630 equivalent greater scope of penetration 237 00:12:33,420 --> 00:12:29,720 and a sensitivity which permits 1% 238 00:12:36,160 --> 00:12:33,430 difference in metal density to be read 239 00:12:37,870 --> 00:12:36,170 by the end of April thermal insulation 240 00:12:40,269 --> 00:12:37,880 had been installed on engine number 241 00:12:43,060 --> 00:12:40,279 fourteen - one at edwards field 242 00:12:45,460 --> 00:12:43,070 laboratory extended hold tests were then 243 00:12:46,810 --> 00:12:45,470 conducted by dropping locks and fuel to 244 00:12:49,060 --> 00:12:46,820 the main propellant valves and 245 00:12:51,370 --> 00:12:49,070 monitoring ambient air temperatures and 246 00:12:56,350 --> 00:12:51,380 component skin temperatures inside the 247 00:12:58,060 --> 00:12:56,360 cocoon several fabricated electrical 248 00:13:00,250 --> 00:12:58,070 interface panels were built and tested 249 00:13:02,590 --> 00:13:00,260 during the quarter these panels are 250 00:13:07,660 --> 00:13:02,600 constructed of machined parts and formed 251 00:13:09,310 --> 00:13:07,670 sheet metal parts bolted together the 252 00:13:11,829 --> 00:13:09,320 testing procedure was similar to that 253 00:13:14,470 --> 00:13:11,839 used on the cast version preliminary 254 00:13:16,389 --> 00:13:14,480 analysis of test data indicates that the 255 00:13:20,460 --> 00:13:16,399 fabricated panel is structurally 256 00:13:22,930 --> 00:13:20,470 adequate for maximum flight loads a 257 00:13:24,910 --> 00:13:22,940 teardown display for engineering 258 00:13:27,280 --> 00:13:24,920 examination and inspection of engine 259 00:13:29,500 --> 00:13:27,290 number two double O six at rocket deines 260 00:13:31,120 --> 00:13:29,510 Canoga Park plant marked formal 261 00:13:34,090 --> 00:13:31,130 completion of the flight rating test 262 00:13:36,850 --> 00:13:34,100 phase of the f1 program the engine had 263 00:13:41,920 --> 00:13:36,860 been static fired in the frt calibration 264 00:13:44,920 --> 00:13:41,930 series at edwards at the marshall center 265 00:13:46,990 --> 00:13:44,930 the first f1 engine for the first s1 c 266 00:13:49,630 --> 00:13:47,000 flight stage was delivered by Rocketdyne 267 00:13:57,190 --> 00:13:49,640 in March and is now undergoing minor 268 00:14:02,330 --> 00:14:00,650 the first j2 engine liquid oxygen turbo 269 00:14:04,520 --> 00:14:02,340 pumped to be assembled at rocket dines 270 00:14:06,890 --> 00:14:04,530 Neosho Missouri plant was completed in 271 00:14:09,740 --> 00:14:06,900 March transfer of this component 272 00:14:11,360 --> 00:14:09,750 fabrication operation to Neosho was made 273 00:14:13,400 --> 00:14:11,370 to take advantage of manufacturing 274 00:14:15,560 --> 00:14:13,410 facilities there and to relieve the 275 00:14:17,450 --> 00:14:15,570 workload in the turbomachinery area at 276 00:14:21,560 --> 00:14:17,460 rocket deines Canoga Park California 277 00:14:23,990 --> 00:14:21,570 plant after calibration of the Neosho 278 00:14:26,600 --> 00:14:24,000 facility's newly operational balancing 279 00:14:28,910 --> 00:14:26,610 machine temporary balancing of the j2 280 00:14:31,880 --> 00:14:28,920 locks impeller was accomplished using 281 00:14:33,710 --> 00:14:31,890 beeswax weights metal is later removed 282 00:14:35,660 --> 00:14:33,720 from the impeller it points opposite to 283 00:14:41,120 --> 00:14:35,670 the weights to produce a balanced 284 00:14:43,580 --> 00:14:41,130 component the last of five j2 engines 285 00:14:45,860 --> 00:14:43,590 for various phases of the s4b battleship 286 00:14:48,590 --> 00:14:45,870 test program was delivered to Douglas 287 00:14:50,450 --> 00:14:48,600 Sacramento on May 1st this engine which 288 00:14:52,880 --> 00:14:50,460 is of the saturn v flight vehicle 289 00:15:01,640 --> 00:14:52,890 configuration possesses a restart 290 00:15:03,680 --> 00:15:01,650 capability a total of six successful 291 00:15:05,960 --> 00:15:03,690 malfunction tests were performed at 292 00:15:07,910 --> 00:15:05,970 Santa Susana this quarter as part of 293 00:15:10,490 --> 00:15:07,920 requirements for the j2 flight rating 294 00:15:12,440 --> 00:15:10,500 test program the engine was deliberately 295 00:15:14,840 --> 00:15:12,450 fired with various malfunctions to 296 00:15:17,210 --> 00:15:14,850 determine the effect on performance and 297 00:15:24,110 --> 00:15:17,220 a/c of a site shutdown could be 298 00:15:30,000 --> 00:15:27,600 frt engine number 202 3 was acceptance 299 00:15:32,579 --> 00:15:30,010 tested and the formal frt program was 300 00:15:34,319 --> 00:15:32,589 begun in May following electrical and 301 00:15:35,250 --> 00:15:34,329 mechanical check out of the engine on 302 00:15:44,750 --> 00:15:35,260 the stand 303 00:15:50,129 --> 00:15:47,610 vertical test and 3a which is equipped 304 00:15:52,079 --> 00:15:50,139 to simulate altitude conditions was 305 00:15:54,210 --> 00:15:52,089 reactivated with this initial static 306 00:16:03,780 --> 00:15:54,220 firing in March after completion of 307 00:16:05,189 --> 00:16:03,790 modifications assembly continued at 308 00:16:08,550 --> 00:16:05,199 Marshall on the flight systems 309 00:16:12,000 --> 00:16:08,560 instrument unit 500 FS this is the first 310 00:16:13,759 --> 00:16:12,010 Saturn 5 iu in which all instrumentation 311 00:16:16,259 --> 00:16:13,769 will be actual working hardware 312 00:16:19,110 --> 00:16:16,269 meanwhile the facilities checkout unit 313 00:16:21,780 --> 00:16:19,120 500 F is in storage and will be shipped 314 00:16:24,060 --> 00:16:21,790 to Cape Kennedy in August structural 315 00:16:26,939 --> 00:16:24,070 fabrication of the Saturn 5 vibration 316 00:16:29,189 --> 00:16:26,949 test unit 500 V is virtually complete 317 00:16:32,100 --> 00:16:29,199 and component assembly will be finished 318 00:16:36,150 --> 00:16:32,110 next quarter assembly of the Saturn 5 iu 319 00:16:39,079 --> 00:16:36,160 breadboard test unit SIU 500 ST is 320 00:16:45,600 --> 00:16:43,470 SIU 200 500 s a structural test unit 321 00:16:48,689 --> 00:16:45,610 common to both the Saturn 1b and 5 322 00:16:51,059 --> 00:16:48,699 programs was installed atop an s4 B 323 00:16:54,360 --> 00:16:51,069 forward skirt for structural testing 324 00:16:58,259 --> 00:16:54,370 which got underway May 27th a second IU 325 00:17:00,750 --> 00:16:58,269 structure designated SIU 200 500 s to 326 00:17:03,120 --> 00:17:00,760 using segments manufactured by North 327 00:17:05,850 --> 00:17:03,130 American Aviation will be assembled by 328 00:17:09,600 --> 00:17:05,860 IBM and tested to qualify the structures 329 00:17:15,329 --> 00:17:09,610 for Saturn 5 I use and SIU 203 and 330 00:17:17,909 --> 00:17:15,339 subsequent the first s2 124 m stabilized 331 00:17:20,069 --> 00:17:17,919 platform for the IU was delivered to 332 00:17:22,319 --> 00:17:20,079 Marshall by the manufacturer Bendix 333 00:17:28,439 --> 00:17:22,329 corporation in March and is undergoing 334 00:17:30,440 --> 00:17:28,449 checkout by MSF C personnel the first 335 00:17:33,450 --> 00:17:30,450 aerospace systems test & Evaluation 336 00:17:35,730 --> 00:17:33,460 console known as ass tech for laboratory 337 00:17:35,940 --> 00:17:35,740 check out of the IU digital computer and 338 00:17:38,550 --> 00:17:35,950 day 339 00:17:41,850 --> 00:17:38,560 Durr was also delivered to Marshall by 340 00:17:43,140 --> 00:17:41,860 IBM or Wigga New York a significant 341 00:17:45,270 --> 00:17:43,150 development milestone 342 00:17:47,130 --> 00:17:45,280 this marked successful completion of an 343 00:17:48,960 --> 00:17:47,140 overall system's marriage of the launch 344 00:17:54,680 --> 00:17:48,970 vehicle digital computer and data 345 00:17:58,980 --> 00:17:56,850 checkout of the integrated automatic 346 00:18:01,380 --> 00:17:58,990 checkout telemetry ground station was 347 00:18:04,050 --> 00:18:01,390 performed by IBM Huntsville during the 348 00:18:05,880 --> 00:18:04,060 report period this system is capable of 349 00:18:08,010 --> 00:18:05,890 receiving recording processing and 350 00:18:10,200 --> 00:18:08,020 analyzing data transmitted by the 351 00:18:15,180 --> 00:18:10,210 various telemetry links of the Saturn 352 00:18:18,150 --> 00:18:15,190 vehicles and IU's milling of the 353 00:18:20,970 --> 00:18:18,160 mounting frame for the IU's st 124 M 354 00:18:26,730 --> 00:18:20,980 stabilized platform was also performed 355 00:18:28,950 --> 00:18:26,740 by IBM this quarter at the Huntsville 356 00:18:31,320 --> 00:18:28,960 facility work began in April on building 357 00:18:34,260 --> 00:18:31,330 number 5 to be used for administrative 358 00:18:35,940 --> 00:18:34,270 and engineering offices IBM this quarter 359 00:18:38,550 --> 00:18:35,950 was awarded a contract for integration 360 00:18:40,830 --> 00:18:38,560 and check out of IU's in addition to its 361 00:18:51,060 --> 00:18:40,840 previous responsibility for design and 362 00:18:53,580 --> 00:18:51,070 manufacturing the first of 24 ground 363 00:18:55,980 --> 00:18:53,590 computer systems from RCA data Systems 364 00:18:58,200 --> 00:18:55,990 Division Van Nuys California has been 365 00:19:01,440 --> 00:18:58,210 delivered to the Marshall Center the 366 00:19:03,660 --> 00:19:01,450 system known as the RCA 110a was 367 00:19:05,760 --> 00:19:03,670 installed in Marshalls s1c stage 368 00:19:08,100 --> 00:19:05,770 check-out facility which is now in 369 00:19:12,680 --> 00:19:08,110 process of buildup Boeing Company 370 00:19:17,430 --> 00:19:15,120 Marshalls new Saturn 5 system 371 00:19:19,830 --> 00:19:17,440 development facility also known as the 372 00:19:21,780 --> 00:19:19,840 Saturn 5 breadboard began to take shape 373 00:19:24,480 --> 00:19:21,790 late in the quarter with initial 374 00:19:27,900 --> 00:19:24,490 installation of equipment including 110a 375 00:19:30,090 --> 00:19:27,910 computers from RCA and a digital command 376 00:19:33,330 --> 00:19:30,100 system from radiation incorporated at 377 00:19:35,610 --> 00:19:33,340 Palm Bay Florida the Saturn 5 breadboard 378 00:19:37,830 --> 00:19:35,620 being built up in Marshalls quality and 379 00:19:43,290 --> 00:19:37,840 reliability assurance lab will be 380 00:19:45,240 --> 00:19:43,300 operated by Boeing upon completion the 381 00:19:48,210 --> 00:19:45,250 Saturn 5 breadboard will appear like 382 00:19:49,650 --> 00:19:48,220 this tabletop scale model in addition to 383 00:19:51,720 --> 00:19:49,660 various staged simulation of 384 00:19:55,020 --> 00:19:51,730 Whitman the facility will contain such 385 00:19:58,950 --> 00:19:55,030 vehicle hardware as an f1 engine s4b 386 00:20:01,380 --> 00:19:58,960 stage aft section with j2 engine and s4 387 00:20:10,680 --> 00:20:01,390 be forward skirt with instrument unit 388 00:20:13,050 --> 00:20:10,690 attached at Marshall's Mississippi test 389 00:20:14,940 --> 00:20:13,060 facility construction progressed 390 00:20:18,270 --> 00:20:14,950 steadily this quarter on the test 391 00:20:21,240 --> 00:20:18,280 complexes to s2 stage static test stands 392 00:20:24,420 --> 00:20:21,250 and the dual position s1 c stage static 393 00:20:26,760 --> 00:20:24,430 test stand as well as on the associated 394 00:20:29,280 --> 00:20:26,770 facilities in mt F's laboratory and 395 00:20:34,410 --> 00:20:29,290 engineering complex and support services 396 00:20:36,990 --> 00:20:34,420 complex an activation task force was 397 00:20:39,090 --> 00:20:37,000 also at work at MTF to help provide an 398 00:20:41,280 --> 00:20:39,100 orderly transition from construction and 399 00:20:43,800 --> 00:20:41,290 equipment installation to operational 400 00:20:48,930 --> 00:20:43,810 capability as various facilities are 401 00:20:51,720 --> 00:20:48,940 completed delivery of the s2 stages for 402 00:20:54,360 --> 00:20:51,730 testing at MTF has been rescheduled with 403 00:20:56,700 --> 00:20:54,370 the s2 t all systems due to be the first 404 00:21:00,120 --> 00:20:56,710 instead of the facilities checkout stage 405 00:21:02,250 --> 00:21:00,130 the s2 t a multi-purpose ground test 406 00:21:04,650 --> 00:21:02,260 stage slated for delivery in september 407 00:21:06,810 --> 00:21:04,660 will allow a full duration static firing 408 00:21:09,660 --> 00:21:06,820 capability providing additional data 409 00:21:12,060 --> 00:21:09,670 prior to firing s21 the change also 410 00:21:14,700 --> 00:21:12,070 allows more expeditious use of s2 t 411 00:21:20,580 --> 00:21:14,710 ground support equipment relieving an s 412 00:21:24,330 --> 00:21:20,590 and ID manufacturing problem in summary 413 00:21:26,370 --> 00:21:24,340 March April and May 1965 witnessed 414 00:21:28,140 --> 00:21:26,380 substantial achievement along a diverse 415 00:21:30,300 --> 00:21:28,150 front with ground support equipment 416 00:21:33,840 --> 00:21:30,310 being integrated into the program in 417 00:21:35,970 --> 00:21:33,850 increasing volume various ground tests 418 00:21:39,300 --> 00:21:35,980 instrument units in final stages of 419 00:21:41,840 --> 00:21:39,310 completion continuing advances in engine 420 00:21:44,580 --> 00:21:41,850 development testing and production 421 00:21:47,010 --> 00:21:44,590 successful s4 B stage propellant loading 422 00:21:49,110 --> 00:21:47,020 tests and continuing flight stage 423 00:21:51,960 --> 00:21:49,120 assembly operations 424 00:21:55,040 --> 00:21:51,970 a successful five engine cluster static 425 00:21:57,660 --> 00:21:55,050 firing of the s2 battleship stage 426 00:22:00,870 --> 00:21:57,670 including phases of assembly work on the 427 00:22:03,750 --> 00:22:00,880 first s1c flight stage and the